Start with a like-for-like quote. Use the same product, order quantity, delivery destination, and currency. Compare the actual production site, not the sales office.
This worksheet does not transmit or save entries. Print or save a PDF before closing if you want to keep them.
Compare the same order
Order on the table
Two facilities
Rate the evidence
Use 1 for a poor fit, 3 for acceptable, and 5 for strong. Leave unknowns unscored. Confirm the must-haves before choosing a site.
Rate all four factors for both facilities to compare weighted scores.
Weighted points = (rating ÷ 5) × factor weight. The total is out of 100. The optional cost math does not automatically assign the landed-cost rating.
Optional cost check
Work out landed cost
Use the shared order quantity above. Add only charges not already in the unit quote. Enter zero when there are none; leave unknown charges blank. Enter sellable units for each facility when known; otherwise the estimate assumes every ordered unit is sellable. Compare one-time launch fees separately.
Enter the quantity, unit quote, and additional charges for both facilities to compare costs.
Decide what to verify